  • Under way
  • Started early 2026
  • New garage level
  • Home lift
  • 4 bedrooms with bathrooms
  • Completion planned April 2027

On a hillside above the bay in Santa Ponsa, a family villa is being extended and renovated: a new garage level cut into the rock, a lift from the garage to the top floor, larger living spaces and a rebuilt pool.

Main floor plan before the works
Main floor before the works
Main floor plan after the works, with the extension outlined in red
Main floor after, extension in red
Upper floor plan
Upper floor
The new garage level with the lift and pool
New garage level, lift and pool
Section through the hillside, from the garage to the house
Section, garage to house
The house from the garden side, as designed
Garden elevation, as designed

Plans from the approved project. Some details changed during the build.

Discuss a similar project

The brief

The owners wanted more space and better access on a steep plot: a garage they could drive into, a lift to every floor, a larger open plan living, dining and kitchen space, and four bedrooms with their own bathrooms. The existing pool and terraces were to be rebuilt, and the new rooms wrapped in external insulation for comfort through every season.

My role

I manage the project for the owners, who live abroad, as their project manager and owner's representative. I chose and appointed the builder and the specialist trades, run the site meetings, check the work and every valuation against the technical architect's reviews, keep the budget and send the owners a monthly photo report.

Where it stands

The structure is complete, the roofs are insulated, the pool is refilled and the first fix of the electrics and plumbing is done. Windows go in this winter, followed by floors, finishes and the lift, with completion planned for April 2027.

Thomas Edwards checking the rock face before the walls go in

On site

Every stage checked before it is covered

On a site cut into rock, the ground decides a lot. I am on site through each stage, from the excavation and propping under the existing house to the foundations, the slabs and the services, so problems are caught while they are still easy to fix.

During the works

Site photos from January to November 2026.

Breaking out the old garage and terraces
Breaking out the old garage
Digging the new garage level into the rock
Digging into the rock
Propping the ground under the existing house
Propping under the house
Foundation reinforcement in the rock
Foundation steel
Foundations for the new retaining walls
Retaining wall foundations
Fitting the crane jib
Fitting the crane jib
Formwork for the garage walls
Garage wall formwork
Steel fixed for the terrace slab
Terrace slab steel
The pool shell, rendered and ready to waterproof
Pool shell rendered
Insulated flat roof over the extension
Insulated flat roof
Electrical first fix
Electrics, first fix
Bathroom plumbing in place before the walls close
Bathroom plumbing
Thomas Edwards on site during the excavation
On site during the excavation
Thomas Edwards on site behind the scenes
Behind the scenes

Films from this project

2026Santa PonsaShort, 0:17

On site with Thomas Edwards

Checking the work for the owner, so the build stays on time, on budget and to the standard agreed.